+1 (301) 200-2077
Our case studies highlight real projects where our expertise in building performance, energy optimization, and engineering solutions delivered measurable results for our clients
Grade-A Office Tower — 45 Floors
A comprehensive energy performance engagement for a premium office tower seeking to reduce operational costs, improve tenant comfort, and strengthen ESG reporting.
The asset owner faced rising energy costs and tenant complaints about comfort inconsistency across floors, threatening lease renewals and ESG reporting targets.
Deployed a full retro-commissioning program combined with Zytona's continuous monitoring platform to identify and correct control sequences, scheduling inefficiencies, and simultaneous heating/cooling across 45 floors.
Energy Cost Reduction
Comfort Complaints
Payback Period
Regional Medical Center — 320 Beds
A mission-critical indoor air quality project to bring a regional hospital into full compliance with updated ventilation standards while maintaining uninterrupted 24/7 operations.
The facility needed to meet updated ASHRAE 170 ventilation standards for infection control while managing a constrained capital budget and maintaining 24/7 operations.
Conducted zone-by-zone ventilation verification and implemented targeted airflow balancing in operating rooms, isolation units, and patient wards — achieving full compliance without capital-intensive system replacements.
Ventilation Compliance
HAI Risk Reduction
Energy Waste Eliminated
Tier III Data Center — 50,000 sq ft
A precision commissioning engagement for a new-build data center requiring zero-tolerance environmental validation before going live with critical IT infrastructure.
A new data center build required precision cooling verification and redundancy validation before going live, with zero tolerance for environmental failures.
Executed a comprehensive commissioning program including precision cooling validation, hot/cold aisle containment optimization, and full redundancy failover testing — delivering verified performance confidence before day-one operations.
PUE Improvement
Cooling Efficiency
Uptime Since Launch
Luxury Hotel — 400 Rooms
A guest comfort and energy performance retrofit for a luxury hotel addressing declining satisfaction scores and energy costs 30% above benchmark.
Guest satisfaction scores were declining due to inconsistent room temperatures and noise from aging HVAC equipment, while energy costs were 30% above benchmark.
Performed comprehensive HVAC testing and balancing across all guest rooms and public areas, optimized central plant operations, and deployed Zytona for ongoing comfort monitoring — transforming both guest experience and energy performance.
Guest Comfort Score
Energy Reduction
Noise Complaints